ISLAMABAD: Prime Minister Shehbaz Sharif on Saturday directed the rapid installation of smart meters to improve transparency and curb overbilling in Pakistan’s power sector, according to an official statement.
Pakistan’s power sector faces significant challenges, including billing issues, electricity theft, and data discrepancies. Earlier this year in September, a Senate committee review highlighted these issues, noting that consumers have suffered due to incorrect meter readings and mismanagement.
“The installation of smart meters should be completed at the earliest to ensure transparency in the billing system,” the prime minister instructed the relevant officials in a meeting to review the performance of power distribution companies.
“Overbilling is absolutely unacceptable and strict action will be taken against officials involved in overbilling,” he added.
He also mentioned the problem of electricity theft in certain areas of the country, which contributes to the sector’s financial instability.
This is made possible through various methods, such as meter tampering or using illegal connections to consume power without proper billing.
“Concrete measures must be taken to prevent electricity theft,” the prime minister said.
He instructed the power companies utilize all necessary resources to meet targets set by the National Electric Power Regulatory Authority (NEPRA).
He also instructed merit-based recruitment within power distribution companies, saying no compromise on transparency would be tolerated.
Pakistan PM orders swift installation of smart meters to enhance billing transparency
https://arab.news/pdudd
Pakistan PM orders swift installation of smart meters to enhance billing transparency
- Shehbaz Sharif calls overbilling unacceptable, orders action against officials involved in the practice
- Sharif instructs the authorities to take concrete measures to prevent electricity theft in the country